International Design Services Inc
News | Careers 

508 projects found.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page

Hofstra University School of Medicine
May-2013
Target Store - LA Sunset
May-2013
Lawton Public Schools Freedom Elementary School
May-2013
Culvert Valve Bulkheads at Kentucky Lock
May-2013
UAH Nursing Building Renovation and Expansion
May-2013
Long Beach West Elementary School
May-2013
Melville Fire District New Substation No. 1
May-2013
Emory Chemistry Center Additions and Renovations
May-2013
ME 105-12 F173 Southern State SOLVR Modular Assembly
Apr-2013
Ford Dearborn Robot Repair Crane Framing
Apr-2013
West Campus Cogeneration Facility
Apr-2013
AGV Highway Legs 1-4 & 6
Apr-2013
The Forum Renovation
Apr-2013
Porsche Cars North America
Apr-2013
Penn Presbyterian Medical Center - Advance Care Expansion
Apr-2013
Donghee - Kautex
Apr-2013
KSU East Side Sport Lighting Addition
Apr-2013
Northhampton Middle School
Apr-2013
Global Foundries - TDC Project Stairs
Apr-2013
Benteler Steel/Tube Manufacturing Project
Mar-2013
 
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page


Add us on Facebook
Subscribe to Newsletter
Projects

Projects Details
Search:  
Previous Project 100 of 508 Next Project

THAAD Instructional Facility
Project Name:
Date: Jun-2012
Project Status: Ongoing
Location: Fort Sill, OK
Tonnage: 800
Fabricator: Gipson Steel
 

This project is a 2 story new construction instructional facility with an approximate area of 97,720 sq.ft. THAAD is a Automated-Aided Instructional facility building with classrooms, office and instructors areas, maintenance training bays, systems maintenance area, communication room, and safe room.

This building is made up of columns, infill beams,  bracing, perimeter framing for pour stops, floor & roof openings, shop assembled window framing,  interior wall partition support, elevator support steel, lintels, bollards, stairs and rails. IDS’ Scope of work includes 3D modeling in version Tekla 18SR2 for BIM requirements by certified Tekla detailers, production of structural steel shop drawings, erection drawings, and connection design for the bracing connections, shear with axial loads, and stair design from a licensed professional engineer in the state of Oklahoma. Approximate tonnage calculated at 800 tons of structural and miscellaneous steel with a schedule of 8 weeks to approval.

 
No Images Found