International Design Services Inc
News | Careers 

509 projects found.
First page < 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page

Sewell Infiniti Dealership
Jan-2011
Hyundai Transformer Building Miscellaneous
Jan-2011
Purdue University
Jan-2011
Allergan Warehouse
Allergan Warehouse
Jan-2011
Catalina FSD Transportation Center Renovation
Jan-2011
Casa Grande Municipal Courts Facility
Jan-2011
The Outlet Shoppes at Oklahoma City - Building 3
Jan-2011
Lower Wacker Drive
Lower Wacker Drive
Jan-2011
Nobelville Schools
Jan-2011
Terminal Modernization Birmingham-Shuttlesworth International Airport
Terminal Modernization Birmingham-Shuttlesworth International Airport
Jan-2011
Bechtel Pueblo
Jan-2011
Hyundai Transformer US Plant Structural
Hyundai Transformer US Plant Structural
Dec-2010
River Bluff High School
River Bluff High School
Dec-2010
Ameren Portage des Siouz Monorail Design
Dec-2010
HCZ The Promise Academy
HCZ The Promise Academy
Dec-2010
Seabrook Gates
Seabrook Gates
Dec-2010
Temple Shalom
Temple Shalom
Dec-2010
Abraham Lincoln Park Softball Field Complex
Dec-2010
GM Bedford
Nov-2010
Historical Building Renovation
Historical Building Renovation
Nov-2010
 
First page < 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page


Add us on Facebook
Subscribe to Newsletter
Projects

Projects Details
Search:  
Previous Project 361 of 509 Next Project

Primary School 133K New School
Project Name:
Date: Aug-2009
Project Status: Completed
Location: Brooklyn, New York
Tonnage: 1600
Fabricator: Weir Welding Company, Inc.
 

This is a new school construction PS-133K New School in Brooklyn New York own and operated by NY SCA. The project is a 5-storey school building.

IDS acquired the detailing and connection design of the project through bidding process performed by IDS estimate, engineering and marketing staff. IDS scope includes the following:  detailing structural members with connection design. The structural members consist of the following: embeds, columns, beams, trusses, bracing, building edge material  and lots of hung lintels at the perimeter of the building. The project has 16 sequences and its sequence weighs approximately 100 tons. IDS will detail the project in AutoCAD  as fabricator's preference.

IDS has the capabilities also to model the project, however, the customer prefers this in AutoCAD. IDS has more than 300 detailing staff both modeling and AutoCAD, plus connection design engineers. The building  construction is being  categorized as moment frame and braced frame, where moment frames are FR (Fully Restrained). Numerous layouts of the building framing will be prepared for detailing use to make sure the dimensions geometry  of the building will closed. A lot of coordination will be required between IDS detailing staff, IDS engineering staff, architect and engineer to ensure the success of the project.

We have 10-Trusses locations at the gym area.  Bracings are HSS and Double Angles at numerous locations. We do have Moment connections for the beams on the project. We provided set up drawings, advance erection drawing and full calculations at the beginning of the project, IDS provided all of these at the start of the project and waited for the approval before proceeding with the actual detailing.

Also, the hung lintels, consist of framed angles, being shop attached to the perimeter beams, it added work for the detailing side, but, it made it easy in the field during the erection. The detailing starts by preparing the ABM, anchor bolt plan & details, shop drawings, erection drawings and field bolt list. Part of IDS detailing scope will also include preparing for the program files such as cnc , dxf and kss files. There are no  Joist materials on the project, all members are structural steel materials.

The project was a success. IDS has detailed a number of buildings in New York  that are under SCA control. Currently IDS is detailing 3 more school buildings, similar to the school buildings IDS previously detailed.