International Design Services Inc
News | Careers 

508 projects found.
First page < 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page

Water Treatment Plant
Sep-2010
Fort Lee Lodge Additional Anchors
Sep-2010
Smuckers
Sep-2010
McKinley Elementary School
McKinley Elementary School
Aug-2010
LPV 109
Jul-2010
Fort Lee Lodge
Fort Lee Lodge
Jul-2010
McDermott Altamira Oil Platform Facility
McDermott Altamira Oil Platform Facility
Jul-2010
ACCD Performing Arts Bldg
Jul-2010
ACCD Fine Arts Bldg
Jul-2010
Clarinda Hospital
Jun-2010
Texas A&M University Multipurpose Building
Texas A&M University Multipurpose Building
Jun-2010
Carilion Clinic
Jun-2010
Willow Bend Expansion
Jun-2010
Roller Gate Project
Jun-2010
Ladue Early Childhood Center
Ladue Early Childhood Center
Jun-2010
Kronospan 2
Jun-2010
Greely Police Station
May-2010
Western Closure Complex Bridge
Western Closure Complex Bridge
May-2010
Shunganunga Creek Bridge
Shunganunga Creek Bridge
May-2010
Ft Lee Medical-Dental Clinic
May-2010
 
First page < 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 > Last Page


Add us on Facebook
Subscribe to Newsletter
Projects

Projects Details
Search:  
Previous Project 406 of 508 Next Project

C17 Mainenance Hanger
Project Name:
Date: Feb-2008
Project Status: Completed
Location: Anchorage, Arkansas
Tonnage: to be determined
Fabricator: CH2M Hill Inc.
 
  • Hangar structure with offices and industrial shops.
  • The hangar structure is composed of Special Concentric Braced Frames (SCBF) while the offices and shops are composed of Ordinary Concentric Braced Frames (OCBF).
  • Seismic Design Category C with a Response Modification Factor R=6.0 for the SCBF and R=5.0 for the OCBF of the offices and shops

The SCBF is composed of pipe and HSS vertical brace members that are bolted to the gusset plate. IDS, Inc. scope of work for the project was to design the connections under strict compliance of the provisions of AISC 358-05. The connection design of the braces were originally done by other detailing and engineering firm and the Engineer of Record, CH2MHill, hired IDS, Inc. to recheck and reinforce the connections that include truss connections and shear with axial connections in addition to the vertical brace connections. Connections were re-evaluated for the proper load path and analysis distribution. The project was completed by the 2nd quarter of 2008.

 
No Images Found